Artikel 2:106 Handing-over of the Structure
Geldend
Geldend vanaf 01-10-2005
- Redactionele toelichting
De dag van de datum van publicatie is gezet op 01.
- Bronpublicatie:
01-10-2005, Internet 2005, www.sgecc.net (uitgifte: 01-10-2005, kamerstukken/regelingnummer: -)
- Inwerkingtreding
01-10-2005
- Bronpublicatie inwerkingtreding:
01-10-2005, Internet 2005, www.sgecc.net (uitgifte: 01-10-2005, kamerstukken/regelingnummer: -)
- Vakgebied(en)
Verbintenissenrecht / Overeenkomst
(1)
If the constructor regards the structure, or any part of it that is fit for independent use, as sufficiently completed and wishes to transfer control over it to the client, the client must accept such control within a reasonable time after being notified. The client may refuse to accept the control when the structure, or the relevant part of it, does not conform to the contract and such non-conformity makes it unfit for use.
(2)
Acceptance by the client of the control over the structure does not relieve the constructor wholly or partially from liability. This rule also applies when the client is under a contractual obligation to inspect, supervise or accept the structure or the construction of it.