Einde inhoudsopgave
Unidroit Principles of International Commercial Contracts 2010
Officiële Toelichting
Geldend
Geldend vanaf 01-05-2011
- Redactionele toelichting
De datum van inwerkingtreding is de datum van afkondiging.
- Bronpublicatie:
10-05-2011, Internet 2011, www.unidroit.org (uitgifte: 10-05-2011, kamerstukken/regelingnummer: -)
- Inwerkingtreding
01-05-2011
- Bronpublicatie inwerkingtreding:
10-05-2011, Internet 2011, www.unidroit.org (uitgifte: 10-05-2011, kamerstukken/regelingnummer: -)
- Vakgebied(en)
Internationaal privaatrecht / Algemeen
Verbintenissenrecht / Algemeen
Verbintenissenrecht / Overeenkomst
1. Contract with terms deliberately left open
A contract may be silent on one or more issues because the parties simply did not think of them during the negotiations. Provided that the parties have agreed on the terms essential to the type of transaction concerned, a contract will nonetheless have been concluded and the missing terms will be supplied on the basis of Articles 4.8 or 5.1.2 (see Comment 1 on Article 2.1.2). Quite different is the case dealt with in this Article: here the parties intentionally leave open one or more terms because they are unable or unwilling to determine them at the time of the conclusion of the contract, and refer for their determination to an agreement to be made by them at a later stage, or to a third person.
This latter situation, which is especially frequent in, although not confined to, long-term transactions, gives rise in essence to two problems: first, whether the fact that the parties have intentionally left terms open prevents a contract from coming into existence and second, if this is not the case, what will happen to the contract if the parties subsequently fail to reach agreement or the third person fails to make the determination.
2. Open terms not in themselves an impediment to valid conclusion of contract
Paragraph (1) states that if the parties intended to conclude a contract, the fact that they have intentionally left a term to be agreed upon in further negotiations or to be determined by a third person does not prevent a contract from coming into existence.
In cases where it is not expressly stated, the parties' intention to conclude a contract notwithstanding the terms left open may be inferred from other circumstances, such as the non-essential character of the terms in question, the degree of definiteness of the agreement as a whole, the fact that the open terms relate to items which by their very nature can be determined only at a later stage, the fact that the agreement has already been partially executed, etc.
Illustration
1
A, a shipping line, enters into a detailed agreement with B, a terminal operator, for the use of B's container terminal. The agreement fixes the minimum volume of containers to be discharged or loaded annually and the fees payable, while the fees for additional containers are left to be determined if and when the minimum volume is reached. Two months later A learns that B's competitor would offer better conditions and refuses to perform, claiming that the agreement with B never resulted in a binding contract because the question of the fees had not been settled. A is liable for non-performance because the detailed character of the agreement as well as the fact that both A and B began performance immediately indicate clearly that their intention was to enter into a binding agreement.
3. Failure of mechanism provided for by parties for determination of open terms
If the parties are unable to reach agreement on the open terms or the third person does not determine them, the question arises as to whether or not the contract comes to an end. According to paragraph (2) of this Article the existence of the contract is not affected ‘provided that there is an alternative means of rendering the term definite that is reasonable in the circumstances, having regard to the intention of the parties’. A first alternative exists whenever the missing term can be supplied on the basis of Article 5.1.2; if the parties have deferred the determination of the missing term to a third person to be nominated by an instance such as the President of the Tribunal, or of the Chamber of Commerce, etc., it may also consist in the appointment of a new third person. The cases in which a given contract may be upheld by resorting to such alternative means will, however, be quite rare in practice. Few problems should arise as long as the term to be implemented is of minor importance. If, on the other hand, the term in question is essential to the type of transaction concerned, there must be clear evidence of the intention of the parties to uphold the contract: among the factors to be taken into account in this connection are whether the term in question relates to items which by their very nature can be determined only at a later stage, whether the agreement has already been partially executed, etc.
Illustration
2
The facts are the same as in Illustration 1, except that when the minimum volume of containers to be loaded or unloaded is reached the parties fail to agree on the fees payable in respect of the additional containers. A stops performing, claiming that the contract has come to an end. A is liable for non-performance, since the fact that the parties have started performing without making future agreement on the missing term a condition for the continuation of their business relationship is sufficient evidence of their intention to uphold the contract even in the absence of such agreement. The fees for the additional containers will be determined according to the criteria laid down in Article 5.1.7.