Einde inhoudsopgave
Unidroit Principles of International Commercial Contracts 2010
Officiële Toelichting
Geldend
Geldend vanaf 01-05-2011
- Redactionele toelichting
De datum van inwerkingtreding is de datum van afkondiging.
- Bronpublicatie:
10-05-2011, Internet 2011, www.unidroit.org (uitgifte: 10-05-2011, kamerstukken/regelingnummer: -)
- Inwerkingtreding
01-05-2011
- Bronpublicatie inwerkingtreding:
10-05-2011, Internet 2011, www.unidroit.org (uitgifte: 10-05-2011, kamerstukken/regelingnummer: -)
- Vakgebied(en)
Internationaal privaatrecht / Algemeen
Verbintenissenrecht / Algemeen
Verbintenissenrecht / Overeenkomst
1. Disadvantaged party entitled to request renegotiations
Since hardship consists in a fundamental alteration of the equilibrium of the contract, paragraph (1) of this Article in the first instance entitles the disadvantaged party to request the other party to enter into renegotiation of the original terms of the contract with a view to adapting them to the changed circumstances.
Illustration
1
A, a construction company situated in country X, enters into a lump sum contract with B, a governmental agency, for the erection of a plant in country Y. Most of the sophisticated machinery has to be imported from abroad. Due to an unexpected devaluation of the currency of country Y, which is the currency of payment, the cost of the machinery increases dramatically. A is entitled to request B to renegotiate the original contract price so as to adapt it to the changed circumstances.
A request for renegotiations is not admissible where the contract itself already incorporates a clause providing for the automatic adaptation of the contract (e.g. a clause providing for automatic indexation of the price if certain events occur).
Illustration
2
The facts are the same as in Illustration 1, except that the contract contains a price indexation clause relating to variations in the cost of materials and labour. A is not entitled to request a renegotiation of the price.
However, even in such a case renegotiation on account of hardship would not be precluded if the adaptation clause incorporated in the contract did not contemplate the events giving rise to hardship.
Illustration
3.
The facts are the same as in Illustration2, except that the substantial increase in A's costs is due to the adoption of new safety regulations in country Y. A is entitled to request B to renegotiate the original contract price so as to adapt it to the changed circumstances.
2. Request for renegotiations without undue delay
The request for renegotiations must be made as quickly as possible after the time at which hardship is alleged to have occurred (paragraph (1)). The precise time for requesting renegotiations will depend upon the circumstances of the case: it may, for instance, be longer when the change in circumstances takes place gradually (see Comment 3(b) on Article 6.2.2).
The disadvantaged party does not lose its right to request renegotiations simply because it fails to act without undue delay. The delay in making the request may however affect the finding as to whether hardship actually existed and, if so, its consequences for the contract.
3. Grounds for request for renegotiations
Paragraph (1) of this Article also imposes on the disadvantaged party a duty to indicate the grounds on which the request for renegotiations is based, so as to permit the other party better to assess whether or not the request for renegotiations is justified. An incomplete request is to be considered as not being raised in time, unless the grounds of the alleged hardship are so obvious that they need not be spelt out in the request.
Failure to set forth the grounds on which the request for renegotiations is based may have similar effects to those resulting from undue delay in making the request (see Comment 2 on this Article).
4. Request for renegotiations and withholding of performance
Paragraph (2) of this Article provides that the request for renegotiations does not of itself entitle the disadvantaged party to withhold performance. The reason for this lies in the exceptional character of hardship and in the risk of possible abuses of the remedy. Withholding performance may be justified only in extraordinary circumstances.
Illustration
4
A enters into a contract with B for the construction of a plant. The plant is to be built in country X, which adopts new safety regulations after the conclusion of the contract. The new regulations require additional apparatus and thereby fundamentally alter the equilibrium of the contract making A's performance substantially more onerous. A is entitled to request renegotiations and may withhold performance in view of the time it needs to implement the new safety regulations, but it may also withhold the delivery of the additional apparatus, for as long as the corresponding price adaptation is not agreed.
5. Renegotiations in good faith
Although nothing is said in this Article to that effect, both the request for renegotiations by the disadvantaged party and the conduct of both parties during the renegotiation process are subject to the general principle of good faith and fair dealing (see Article 1.7) and to the duty of co-operation (see Article 5.1.3). Thus the disadvantaged party must honestly believe that a case of hardship actually exists and not request renegotiations as a purely tactical manoeuvre. Similarly, once the request has been made, both parties must conduct the renegotiations in a constructive manner, in particular by refraining from any form of obstruction and by providing all the necessary information.
6. Resort to the court upon failure to reach an agreement
If the parties fail to reach agreement on the adaptation of the contract to the changed circumstances within a reasonable time, paragraph (3) of this Article authorises either party to resort to the court. Such a situation may arise either because the non-disadvantaged party completely ignored the request for renegotiations or because the renegotiations, although conducted by both parties in good faith, did not have a positive outcome.
How long a party must wait before resorting to the court will depend on the complexity of the issues to be settled and the particular circumstances of the case.
7. Court measures in case of hardship
According to paragraph (4) of this Article a court which finds that a hardship situation exists may react in a number of different ways.
A first possibility is for it to terminate the contract. However, since termination in this case does not depend on non-performance by one of the parties, its effects on the performances already rendered might be different from those provided for by the rules governing termination in general (see Articles 7.3.1. et seq.). Accordingly, paragraph (4)(a) provides that termination shall take place ‘at a date and on terms to be fixed’ by the court.
Another possibility would be for a court to adapt the contract with a view to restoring its equilibrium (paragraph (4)(b)). In so doing the court will seek to make a fair distribution of the losses between the parties. This may or may not, depending on the nature of the hardship, involve a price adaptation. However, if it does, the adaptation will not necessarily reflect in full the loss entailed by the change in circumstances, since the court will, for instance, have to consider the extent to which one of the parties has taken a risk and the extent to which the party entitled to receive a performance may still benefit from that performance.
Paragraph (4) of this Article expressly states that the court may terminate or adapt the contract only when this is reasonable. The circumstances may even be such that neither termination nor adaptation is appropriate and in consequence the only reasonable solution will be for the court either to direct the parties to resume negotiations with a view to reaching agreement on the adaptation of the contract, or to confirm the terms of the contract as they stand.
Illustration
5
A, an exporter, undertakes to supply B, an importer in country X, with beer for three years. Two years after the conclusion of the contract new legislation is introduced in country X prohibiting the sale and consumption of alcoholic drinks. B immediately invokes hardship and requests A to renegotiate the contract. A recognises that hardship has occurred, but refuses to accept the modifications of the contract proposed by B. After one month of fruitless discussions B resorts to the court.
If B has the possibility to sell the beer in a neighbouring country, although at a substantially lower price, the court may decide to uphold the contract but to reduce the agreed price.
If on the contrary B has no such possibility, it may be reasonable for the court to terminate the contract, at the same time however requiring B to pay A for the last consignment still en route.