Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
Article 16 Operation of facilities
Geldend
Geldend vanaf 18-06-2001
- Bronpublicatie:
05-09-1997, Trb. 1999, 164 (uitgifte: 03-09-1999, kamerstukken/regelingnummer: -)
- Inwerkingtreding
18-06-2001
- Bronpublicatie inwerkingtreding:
22-06-2001, Trb. 2001, 111 (uitgifte: 01-01-2001, kamerstukken/regelingnummer: -)
- Vakgebied(en)
Milieurecht / Straling
Milieurecht / Energie
Energierecht (V)
Each Contracting Party shall take the appropriate steps to ensure that:
- (i)
the licence to operate a radioactive waste management facility is based upon appropriate assessments as specified in Article 15 and is conditional on the completion of a commissioning programme demonstrating that the facility, as constructed, is consistent with design and safety requirements;
- (ii)
operational limits and conditions, derived from tests, operational experience and the assessments as specified in Article 15 are defined and revised as necessary;
- (iii)
operation, maintenance, monitoring, inspection and testing of a radioactive waste management facility are conducted in accordance with established procedures. For a disposal facility the results thus obtained shall be used to verify and to review the validity of assumptions made and to update the assessments as specified in Article 15 for the period after closure;
- (iv)
engineering and technical support in all safety-related fields are available throughout the operating lifetime of a radioactive waste management facility;
- (v)
procedures for characterization and segregation of radioactive waste are applied;
- (vi)
incidents significant to safety are reported in a timely manner by the holder of the licence to the regulatory body;
- (vii)
programmes to collect and analyse relevant operating experience are established and that the results are acted upon, where appropriate;
- (viii)
decommissioning plans for a radioactive waste management facility other than a disposal facility are prepared and updated, as necessary, using information obtained during the operating lifetime of that facility, and are reviewed by the regulatory body;
- (ix)
plans for the closure of a disposal facility are prepared and updated, as necessary, using information obtained during the operating lifetime of that facility and are reviewed by the regulatory body.