Einde inhoudsopgave
Common Regulations under the Madrid Agreement Concerning the International Registration of Marks and the Protocol Relating to that Agreement
Rule 7 Notification of Certain Special Requirements
Geldend
Geldend vanaf 01-02-2020
- Bronpublicatie:
02-10-2018, Trb. 2021, 37 (uitgifte: 26-03-2021, kamerstukken/regelingnummer: -)
- Inwerkingtreding
01-02-2020
- Bronpublicatie inwerkingtreding:
02-10-2018, Trb. 2021, 37 (uitgifte: 26-03-2021, kamerstukken/regelingnummer: -)
- Vakgebied(en)
Intellectuele-eigendomsrecht / Modellen- en merkenrecht
1.
[Deleted]
2.
[Intention to Use the Mark] Where a Contracting Party requires, as a designated Contracting Party, a declaration of intention to use the mark, it shall notify that requirement to the Director General. Where that Contracting Party requires the declaration to be signed personally by the applicant and to be made on a separate official form annexed to the international application, the notification shall contain a statement to that effect and shall specify the exact wording of the required declaration. Where the Contracting Party further requires the declaration to be in English, French or Spanish, the notification shall specify the required language.
3.
[Notification]
- a)
Any notification referred to in paragraph (2) may be made at the time of the deposit by the Contracting Party of its instrument of ratification, acceptance or approval of, or accession to, the Protocol, and the effective date of the notification shall be the same as the date of entry into force of the Protocol with respect to the Contracting Party having made the notification. The notification may also be made later, in which case the notification shall have effect three months after its receipt by the Director General, or at any later date indicated in the notification, in respect of any international registration whose date is the same as or is later than the effective date of the notification.
- b)
Any notification made under paragraph (2) may be withdrawn at any time. The notice of withdrawal shall be addressed to the Director General. The withdrawal shall have effect upon receipt of the notice of withdrawal by the Director General or at any later date indicated in the notice.