Artikel 5:106 Handing over of the Design
Geldend
Geldend vanaf 01-10-2005
- Redactionele toelichting
De dag van de datum van publicatie is gezet op 01.
- Bronpublicatie:
01-10-2005, Internet 2005, www.sgecc.net (uitgifte: 01-10-2005, kamerstukken/regelingnummer: -)
- Inwerkingtreding
01-10-2005
- Bronpublicatie inwerkingtreding:
01-10-2005, Internet 2005, www.sgecc.net (uitgifte: 01-10-2005, kamerstukken/regelingnummer: -)
- Vakgebied(en)
Verbintenissenrecht / Overeenkomst
In so far as the designer regards the design, or a part of it that is fit for carrying out independently from the completion of the rest of the design, as sufficiently completed and wishes to transfer the design to the client, the client must accept it within a reasonable time after being notified. The client may refuse to accept the design when it, or the relevant part of it, does not conform to the contract and such non-conformity amounts to a fundamental non-performance within the meaning of Article 8:103 PECL (Fundamental Non-Performance).