Convention Supplementary to the Paris Convention of 29th July 1960 on Third Party Liability in the Field of Nuclear Energy
Article 12bis
Geldend
Geldend vanaf 01-01-2022
- Bronpublicatie:
12-02-2004, Trb. 2005, 90 (uitgifte: 18-04-2005, kamerstukken/regelingnummer: -)
- Inwerkingtreding
01-01-2022
- Bronpublicatie inwerkingtreding:
03-02-2022, Trb. 2022, 12 (uitgifte: 03-02-2022, kamerstukken/regelingnummer: -)
- Vakgebied(en)
Milieurecht / Straling
Milieurecht / Energie
Energierecht (V)
a)
In case of accession to this Convention, the public funds mentioned in Article 3(b)(iii) are increased by:
- (i)
35% of an amount determined by applying to the above-mentioned sum the ratio between the gross domestic product at current prices of the acceding Party and the total of the gross domestic products at current prices of all the Contracting Parties, excluding that of the acceding Party, and
- (ii)
65% of an amount determined by applying to the above-mentioned sum the ratio between the thermal power of the reactors situated in the territory of the acceding Party and the total thermal power of the reactors situated in the territories of all the Contracting Parties, excluding that of the acceding Party.
b)
The increased amount referred to in paragraph (a) shall be rounded up to the nearest amount expressed in thousands of euro.
c)
The gross domestic product of the acceding Party shall be determined in accordance with the official statistics published by the Organisation for Economic Co-operation and Development for the year preceding the year in which the accession comes into force.
d)
The thermal power of the acceding Party shall be determined in accordance with the list of nuclear installations communicated by that Government to the Belgian Government pursuant to Article 13(b), provided that for the purpose of calculating the contributions under paragraph (a)(ii) of this Article, a reactor shall only be taken into consideration as from the date when it first reaches criticality and a reactor shall be excluded from the calculation when all nuclear fuel has been removed permanently from the reactor core and has been stored safely in accordance with approved procedures.